Grand-Rue 16 · Auvernier
The character remains.
The kitchen takes shape.
Old timber beams, a strengthened structure and a reimagined kitchen. Follow the stages of this transformation in Auvernier.
↘See the transformation

November → December 2025. The same wall at two stages, from two angles. Floor protection shows that installation is still in progress.
From early works to installation
Kitchen renovation
Historic building
The project01 — 03
Strengthening what is there.
Rethinking everyday use.
Before the cabinetry comes the groundwork: floor reinforcement, Fermacell panels, large-format tiles and a steel beam to strengthen the structure. The old beams and fireplace remain defining features.
Installation of the tall cabinets, built-in oven and base units then reveals the new kitchen. These photographs follow that progression through cabinetry installation.
A silent 22-second photo film made from real images of the works. The last views show installation and finishing in progress. The on-screen titles are in English in this version.
Explore the stages↓Through the works02 — 03
A transformation, step by step.
01November 2025
Strengthening the structure
Opened walls, exposed services and preserved beams: the transformation begins with the groundwork.
02November 2025
Laying the foundations
New tiling is laid around the building’s original features.
03December 2025 · Installation
Seeing the kitchen take shape
The tall cabinets and oven are installed. Work continues with the floor protected.A closer look03 — 03
The details tell the story.
4 project photographs · Click to enlarge