All our projects

Grand-Rue 16 · Auvernier

The character remains.
The kitchen takes shape.

Old timber beams, a strengthened structure and a reimagined kitchen. Follow the stages of this transformation in Auvernier.

See the transformation
Early works
01Early works
Cabinets installed
02Cabinets installed

November → December 2025. The same wall at two stages, from two angles. Floor protection shows that installation is still in progress.

2025

From early works to installation

Grand-Rue 16

Kitchen renovation

Auvernier

Historic building

The transformation in pictures00:22

Strengthening what is there.
Rethinking everyday use.

Before the cabinetry comes the groundwork: floor reinforcement, Fermacell panels, large-format tiles and a steel beam to strengthen the structure. The old beams and fireplace remain defining features.

Installation of the tall cabinets, built-in oven and base units then reveals the new kitchen. These photographs follow that progression through cabinetry installation.

A silent 22-second photo film made from real images of the works. The last views show installation and finishing in progress. The on-screen titles are in English in this version.

Explore the stages

A transformation, step by step.

Strengthening the structure01

November 2025

Strengthening the structure

Opened walls, exposed services and preserved beams: the transformation begins with the groundwork.
Laying the foundations02

November 2025

Laying the foundations

New tiling is laid around the building’s original features.
Seeing the kitchen take shape03

December 2025 · Installation

Seeing the kitchen take shape

The tall cabinets and oven are installed. Work continues with the floor protected.

The details tell the story.

4 project photographs · Click to enlarge

Tall cabinets and oven installed, with floor protection still in place
Tall cabinets and oven installed, with floor protection still in place1 / 4

And your property?

A renovation to imagine.
A project to bring to life.